Offshore energy.
Sustainable future.

POWERING THE GREEN ECONOMY.

BUILT BY ALUCOR

Renewable vision.
Proven execution.

Alucor delivers end-to-end EPC solutions for complex offshore and renewable energy projects. Our capabilities span the engineering, procurement, fabrication, and construction of offshore platforms, subsea structures, marine systems, and onshore facilities supporting wind, solar, and hybrid energy developments.

01.jpg
Alucor welders at work
website background-01-01-01-01.webp

Completed Projects

gradient test web.jpg
Seatrium

Saudi Arabia

                UAE

Supply and fabrication of a DNV Class certified Pedestal Adapter, along with the supply and installation of electrical components. All work is carried out with a focus on safety, quality, and compliance with industry standards.​​​​

gradient test web.jpg
HMC.png

              UAE

             UAE

Machining, fabrication, blasting, and painting of crankshafts, DDM, draw works, and mud pumps. It also includes the complete assembly of these components, ensuring high-quality standards and precise execution throughout each phase.

​​​

​

gradient test web.jpg
FLC.png

Saudi Arabia

                 UAE

Alucor has successfully completed the fabrication and supply of 544 bulkhead panels. The scope of work covered approximately 4,200 tons of structural steel for the Fehmarnbelt Tunnel Project - an 8 km long immersed tunnel connecting Lolland in Denmark to Fehmarn in Germany.

​

gradient test web.jpg
2.Fabrication of Monopile Grillage, Seafastening and AC Tower.jpeg

Saudi Arabia

                  UAE

Alucor has successfully completed Supply and fabrication of heavy steel works totaling over 2,500 tons of NV A36/D36/E36 material grade. The Project Scope includes fabrication of Monopile Grillage, Seafastening and AC Tower.

​

​

​

​​​

gradient test web.jpg
3.Aluminium Hull Fabrication.jpg

              UAE

             UAE

Alucor fabricated a 1,652 kg aluminum hull with precision-engineered G5083 H111 and 6063 T6 materials. The structure was designed to ensure superior strength and durability. This project reinforces our expertise in high-quality aluminum fabrication.

gradient test web.jpg
4.Supply and Manufacture of Deck Modules, Housing, and Fall Pipe System.jpg

              UAE

             UAE

Alucor successfully executed the manufacturing and assembly of deck modules, housing structures, inclined fall pipe systems, and associated equipment, along with the installation of hydraulic systems (hoses, valves, HPUs, piping) and complete electrical works.

gradient test web.jpg
5.Supply, Manufacture and Assembly of Offshore Access Gangways.png

Saudi Arabia

                  UAE

ALUCOR supplied, manufactured, and assembled an extendable telescopic gangway for the Shimizu vessel, meeting stringent DNV-GL standards and reaffirming our commitment to safety, quality, and performance.

gradient test web.jpg
6.Monopile Handling and Installation Equipment on Deck.JPG

              UAE

             UAE

Alucor executed the complete EPC scope for Monopile Handling and Installation Equipment.
This included structural, mechanical, and hydraulic design, fabrication, and assembly.
The system enables installation of monopiles from 6.5m to 12m diameter and 55m to 110m length.

gradient test web.jpg
7.Fabrication of ACIT Grillage, Sea-fastening Frame and Loading Tower.png

              UAE

             UAE

Alucor successfully completed the procurement and fabrication of key maritime infrastructure components. The project, executed between Q3 2022 and Q1 2023, included the MPLT Sea Fastening Frame, SSIT Loading Tower, and ACIT Grillage.

gradient test web.jpg
9.Supply, Manufacture and Installation on Vessel of Jacket Seafastening.png

              UAE

             UAE

Alucor fabricated and installed sea-fastening structures, including lower and intermediate grillage, for the 950MW Moray East Offshore Wind Farm. The wind farm will power up to 950,000 UK homes and contribute 40% of Scotland’s electricity needs.

gradient test web.jpg
A7301492.JPG

              UAE

             UAE

Alucor successfully completed the Pedestal Crane Adapter project, resulted in a substantial enhancement of the Sea Installer vessel's crane capacity. The project involved the construction of a 200mm thick, 15-meter diameter flange. 

gradient test web.jpg
8.Supply and Manufacture of Jacket Grillage for CXFD Offshore Wind farm.jpeg

              UAE

             UAE

Supply and Manufacture of Jacket Grillage for CXFD Offshore Wind Farm

Alucor successfully delivered over 800 tons of precision-fabricated jacket grillage for the CXFD offshore wind farm. All machining was executed in-house, ensuring superior quality and accuracy. The project was completed within 10 weeks, aligned with the client's vessel schedule.