top of page
Mining & Metals projects web header.png

Built to the
highest standards.

EPC SOLUTIONS FOR METAL PLANT & REFINERIES.

ENGINEERING MILESTONES

Heavy structures.
Delivered right.

ALUCOR brings decades of industry experience, broad-based capabilities, and dependable delivery to help customers build robust and reliable equipment, plants and other infrastructure.

Alucor welders at work
website background-01-01-01.webp

Completed Projects

gradient test web.jpg
aerial-of-al-taweelah-alumina-refinery.jpg

Saudi Arabia

                UAE

Alucor executed structural, piping and mechanical installation works across five major plant facilities, including 33km of piping and advanced mechanical systems for bauxite storage and steam piping.

​

​

​

​​​​​

gradient test web.jpg
2. ALBA Line 4 and Line 5 Outage Recovery.jpg

              UAE

             UAE

Alucor supplied Cathode Ring Busbars, Potline Mechanical Installation, and Cathode Sealing Facility Construction. The project scope also included turnkey mechanical & electrical installation works for Cathode Sealing Facility including all sealing equipment and furnaces.

​​​​

gradient test web.jpg
Emal Phase 2 offshor conveyor.jpg

Saudi Arabia

                 UAE

EMAL Phase II​

Alucor successfully executed the turnkey construction of a 5.2 KM offshore alumina conveying system. The scope covered complete fabrication, mechanical and electrical installation, and integration of the conveying system. Over 72 KM of cables were installed to support system operation and control.

gradient test web.jpg
1.Supply and Fabrication of Sand Silos.jpg

Saudi Arabia

                  UAE

Alucor successfully completed the supply and fabrication of six 200-ton silos for a major casting and forging facility in Ras Al Khair, Saudi Arabia. The silos were delivered on time, supporting one of the region’s key industrial development projects.

​​​​​​​​​

gradient test web.jpg
ALBA

              UAE

             UAE

Alucor executed Installation of mechanical equipment & piping works including Block Oven, Prestressing Equipment, Turning Station, Cast Iron Ingot Drying and Combustion Station, Bar Furnace, Ladle Pre-heating Equipment, Conveyers, and Overhead  Cranes. 

​

gradient test web.jpg
2.Engineering, Procurement and Manufacture of Jacketed Pipe Units.jpg

              UAE

             UAE

Alucor designed, fabricated, and delivered 280 proprietary jacketed pipe units (JPUs) in just 14 months.
The project involved 350,000+ inch-dia of piping with an exceptional 0.13% weld reject rate, using first-of-its-kind technology developed with HATCH-OUTOTEC.

gradient test web.jpg
alba line 6.png

Saudi Arabia

                  UAE

ALBA Line 4 and Line 5 Outage Recovery

Alucor executed EPFC works for the Line 4 bypass system, including monitoring, safe removal, and re-energisation assistance of the potroom. The scope covered  cell construction works, along with cell change-outs involving fabrication and installation of damaged busbars.

​​​​​​​​​

gradient test web.jpg
DSC08950.JPG

              UAE

             UAE

Alucor manufactured 520 superstructures, including anode beams, for D18+ technology.
Executed fabrication and installation of airsides for Potrooms 1–3, with bypass installation for silo cleaning.

bottom of page