ALBA Line 4 and Line 5 Outage Recovery.

Design, procurement, manufacture and installation of line 4 bypass system.

Alucor executed EPFC works for the Line 4 Bypass System, ensuring safe removal and re-energisation of the potroom. The scope included overhaul of potshells, superstructures, and cell construction works.


Fabrication and installation of damaged busbars were completed during cell change-outs.
Full refractory lining of potshells was carried out to ensure durability and performance.
The project was delivered safely, on time, and to the highest quality standards.