top of page



ALUCOR executed the complete design, procurement, manufacturing, and installation works for the upgrade and replacement of critical Reverse Osmosis (RO) and Energy Recovery equipment as part of a turnkey EPC contract.
​
State-of-the-art components were sourced from Energy Recovery International (ERI), ensuring enhanced efficiency and performance. ALUCOR also designed and installed all electrical, instrumentation, and control systems.
​
Installation was strategically completed within a one-month planned shutdown to minimize operational disruption and ensure seamless commissioning of the upgraded RO plant.
DEWA Palm SWRO Desalination Plant.
EPC works for capacity upgrade of RO plant.

bottom of page
