top of page
IMG-20250609-WA0015.jpg
PHOTO-2025-04-23-16-55-55_edited.jpg

DEWA K Station RO Plant Carbon Capture Project

Engineering, Procurement, Installation and Commissioning of CO2 Recovery System

ALUCOR successfully completed engineering, procurement, installation and commissioning of CO2 Recovery System.

The objective of the project is to utilize the excess carbon dioxide rich gases from the MSF of K1 and K2 station for the remineralization of the potable water in K-RO and displace the use of commercial carbon dioxide for the K-RO plant.

The scope of work includes dismantling and relocation of the existing units such as  12m Height absorber and interconnecting piping. 

 

Supply of CO2 Absorber Packing Media, Supply of 200 m3/hr Carbon Filter, Supply 500 m3/hr absorber booster pump and All E&I required equipment and materials.

CO2 gas activated carbon filter.jpg
bottom of page